Part of Sky-Line · Process · (Space 18 of 18)

Making it

Sky-Line took six months on site, from June to December 2024, and these are the photographs we took along the way: two flats taken back to their walls, the drawings and the samples, the workshops where the joinery and the metal were made, the library going up piece by piece, the marble and the onyx arriving.

Guarducci ran the works; SM Falegnameria, D’Aleo and Massimo Cecconi made what was drawn, and Comet lit it. The pairs below show a few of those places then and now.

Before and after

June–July 2024

Taking it back

July–September 2024

Drawing and choosing

October–November 2024

In the workshops

November–December 2024

The library

October–December 2024

Marble

November–December 2024

Onyx, wood and paper

December 2024

Nearly there

More process